The recent fires at Wennington caused chaos and devastation for the local residents. The Asbestos Group were involved in removal and disposal of fire effected garages and contents due to contamination. Hopefully it is a step on the journey for the village of Wennington and its residents to return to normal at some point. Well.. read more →
Demolition boss caught stashing asbestos in storage containers Grant Prior6 days ago Share A demolition company boss has been sentenced after posing as an asbestos removal specialist and storing the deadly material in a lock-up container near a school. Lincoln Crown Court heard that between 2017 and 2019, Lee Charles acted as a de facto.. read more →
The Asbestos Group were commissioned to strip out the existing infrastructure at this large entertainment centre, including deconstruction of the elevated restaurant eating areas, the removal of textured coating above the suspended ceiling and carpets with asbestos contaminated bitumen. The strip out had to be completed within four weeks to ensure the next phase of.. read more →
The Asbestos Group were appointed to clear the contaminated contents and debris from this Mid-terraced property which had suffered severe fire damage due to an minor explosion which had destroyed the rear of the property. The access to the building was restricted and on a narrow one way road system. The job was completed within.. read more →
The Asbestos Group were instructed to remove the fire damaged asbestos slate roof from a three storey student accommodation building . Access was difficult to the rear and the front had dormer windows with asbestos tile cladding. Our operatives have the appropriate accreditation for using mobile platforms and the job was completed on time which.. read more →