The Asbestos Group were pleased to assist in the removal of asbestos contaminated equipment and stock from the cellar of this British Legion Club in South Wales. The fire had completely destroyed the stock room and the floor and roof were badly breached. The Asbestos Group cleaned out the cellar of ACMs present and took the.. read more →
In late 2019 The Asbestos Group were requested to survey a fire damaged semi-detached property in Devon, the results confirmed Chrysotile was present throughout the property and The Asbestos Group were awarded the contract to remove all the hazardous waste in line with CAR 2012 and demolish the damaged property. Works commenced with the complete.. read more →
Got to put that PPE to good use! Regards The Asbestos Group 👍 read more →
Party Wall Protection completed by The Asbestos Group: Complete strip out of contaminated contents and soft strip followed by party wall protection. read more →
Merry Christmas Our Opening Hours Christmas Day —- Closed Boxing Day —- Closed Friday 27th Open 9.00am – 5.00pm Monday 30th Open 9.00am – 5.00pm New Years Eve .. read more →
Asbestos Image Gallery
Pieces of AIB
asbestos containing floor tiles in a corridor
AIB ceiling tiles in a corridor
Wall with trowelled loose asbestos
Unscrewing of an AIB ceiling tile.jpg
Torn asbestos pipe lagging
Pipe insulated using both asbestos lagging and rope
Sprayed limpet asbestos on the underside of an asbestos cement roof
Damaged asbestos pipe lagging and debris
Pieces of AIB
Damaged Asbestos Panelling
Damaged asbestos lagging on hot water pipes
Asbestos soffit
Asbestos textured coating
Asbestos cement roof (damaged exterior)
Asbestos panelling around gas meter (damaged exterior)
Asbestos cement drainage pipe
Asbestos cement external building panel
AIB window panelling