Major Entertainment Venue Asbestos Strip Out

The Asbestos Group were commissioned to strip out the existing infrastructure at this large entertainment centre, including deconstruction of the elevated restaurant eating areas, the removal of textured coating above the suspended ceiling and carpets with asbestos contaminated bitumen.
The strip out had to be completed within four weeks to ensure the next phase of the refurbishment programme could be completed, which was done as per our clients instructions.