Congratulations to The Recycling Group on their planned continual expansion with the move into an additional factory at Telford. The Asbestos Group are pleased to have provided an Asbestos Management Survey for the offices at the facility.
Asbestos Image Gallery
 - AIB window panelling
 - Asbestos cement external building panel
 - Asbestos cement drainage pipe
 - Asbestos panelling around gas meter (damaged exterior)
 - Asbestos cement roof (damaged exterior)
 - Asbestos soffit
 - Asbestos textured coating
 - Damaged asbestos lagging on hot water pipes
 - Damaged Asbestos Panelling
 - Pieces of AIB
 - Damaged asbestos pipe lagging and debris
 - Sprayed limpet asbestos on the underside of an asbestos cement roof
 - Pipe insulated using both asbestos lagging and rope
 - Torn asbestos pipe lagging
 - Unscrewing of an AIB ceiling tile.jpg
 - Wall with trowelled loose asbestos
 - AIB ceiling tiles in a corridor
 - asbestos containing floor tiles in a corridor
 - Pieces of AIB
Most Recent News
- Lewis Scott General Manager 11 April 2025
- Asbestos Group Appoint General Manager 20 November 2024
- Asbestos Commercial Roof Removal along with Contaminated Contents. 13 June 2024
- Asbestos Removal and Demolition 4 December 2023
- The Asbestos Group 17 Years Trading 18 July 2023
- Principal Contractor JCT Minor Works Building Contract 24 May 2023
- Major Loss Claim in Essex. 9 January 2023
- Wennington fire:Contaminated Building Deconstruction & Contents Removal. 8 September 2022
