The Asbestos Group were appointed to clear the contaminated contents and debris from this Mid-terraced property which had suffered severe fire damage due to an minor explosion which had destroyed the rear of the property. The access to the building was restricted and on a narrow one way road system.
The job was completed within the agreed time frame and as the photos show another difficult job done well by the team at TAG.
Asbestos Image Gallery
AIB window panelling
Asbestos cement external building panel
Asbestos cement drainage pipe
Asbestos panelling around gas meter (damaged exterior)
Asbestos cement roof (damaged exterior)
Asbestos soffit
Asbestos textured coating
Damaged asbestos lagging on hot water pipes
Damaged Asbestos Panelling
Pieces of AIB
Damaged asbestos pipe lagging and debris
Sprayed limpet asbestos on the underside of an asbestos cement roof
Pipe insulated using both asbestos lagging and rope
Torn asbestos pipe lagging
Unscrewing of an AIB ceiling tile.jpg
Wall with trowelled loose asbestos
AIB ceiling tiles in a corridor
asbestos containing floor tiles in a corridor
Pieces of AIB
Most Recent News
- Demolition Contractor Stored Dangerous Asbestos 7 April 2022
- Major Entertainment Venue Asbestos Strip Out 18 December 2021
- Asbestos Slate Roof Contamination in Fire Damaged Property 2 September 2021
- Asbestos Slate Roof on Three Storey Building 2 April 2021
- Happy New Year. 2021 Will Be Better 🌈🌈🌈 1 January 2021
- Asbestos Contamination in Bar Cellar from Fire in Stock Room 12 November 2020
- Asbestos Survey-Remove Hazardous Waste ( Strip Out )-Installation of Party Wall Protection-Demolition of Semi-detached Property. 16 June 2020
- Not much work but Glad to Help NHS 11 April 2020