14
Sep 2017
September 14, 2017
Asbestos Image Gallery

AIB window panelling

Asbestos cement external building panel

Asbestos cement drainage pipe

Asbestos panelling around gas meter (damaged exterior)

Asbestos cement roof (damaged exterior)

Asbestos soffit

Asbestos textured coating

Damaged asbestos lagging on hot water pipes

Damaged Asbestos Panelling

Pieces of AIB

Damaged asbestos pipe lagging and debris

Sprayed limpet asbestos on the underside of an asbestos cement roof

Pipe insulated using both asbestos lagging and rope

Torn asbestos pipe lagging

Unscrewing of an AIB ceiling tile.jpg

Wall with trowelled loose asbestos

AIB ceiling tiles in a corridor

asbestos containing floor tiles in a corridor

Pieces of AIB
Most Recent News
- Lewis Scott General Manager 11 April 2025
- Asbestos Group Appoint General Manager 20 November 2024
- Asbestos Commercial Roof Removal along with Contaminated Contents. 13 June 2024
- Asbestos Removal and Demolition 4 December 2023
- The Asbestos Group 17 Years Trading 18 July 2023
- Principal Contractor JCT Minor Works Building Contract 24 May 2023
- Major Loss Claim in Essex. 9 January 2023
- Wennington fire:Contaminated Building Deconstruction & Contents Removal. 8 September 2022


